Ahmedabad Railway Station closes elevated road; parking shifted to South MMTH

  • Construction of North Multi-Modal Transport Hub prompts temporary closure of elevated approach road
  • Parking facilities associated with the elevated road relocated to the South MMTH building
  • Passengers advised to follow revised parking arrangements and on-site directions during redevelopment

NE RAILWAY BUREAU

AHMEDABAD, NOV 24

Ahmedabad’s busy Kalupur railway station has ushered in another change in passenger access arrangements, with the elevated road inside the station premises being closed to facilitate the next phase of its ambitious redevelopment. Parking facilities previously associated with the elevated road have been relocated to the South Multi-Modal Transport Hub (MMTH), prompting passengers and motorists to follow the revised arrangements.

The closure comes as construction of the North Multi-Modal Transport Hub (North MMTH) gathers momentum. The railway administration has taken the decision to ensure that construction activities can proceed smoothly and without obstruction.

Parking moved to South MMTH

The elevated road was originally constructed to facilitate smoother passenger movement and provide convenient access to premium parking facilities at the station.

With the redevelopment entering its next phase, the parking facilities associated with the elevated road have now been shifted to the South MMTH building.

Passengers and vehicle owners have been advised to use the parking facilities available at the South MMTH instead of approaching the closed elevated road.

The railway administration has appealed to commuters to take note of the revised arrangements, cooperate with railway personnel and follow the instructions and directional signage displayed across the station premises.

North MMTH marks next phase of redevelopment

The construction of the North MMTH is a significant component of the broader redevelopment programme aimed at transforming Ahmedabad railway station into a modern, integrated transport hub.

The South MMTH has already been developed, while the North MMTH is the next major infrastructure component being taken forward.

The two hubs are envisaged as important elements of an integrated transport network, facilitating smoother passenger transfers and better connectivity between different modes of transportation.

The redevelopment programme is also intended to strengthen the integration of railway facilities with other transport infrastructure, including the metro network, while providing modern parking arrangements and improved passenger amenities.

A more integrated passenger experience

The larger vision is to equip Ahmedabad railway station with contemporary infrastructure, improved accessibility and passenger-centric facilities to cater to growing travel requirements.

The North and South MMTH facilities are expected to contribute to more efficient passenger movement, better vehicle management and a more comfortable travel experience once the redevelopment work is completed.

Meanwhile, passengers travelling to the station by private vehicles and taxis should factor in the revised access and parking arrangements to avoid inconvenience.

The railway administration has urged commuters to extend their cooperation during the construction period and adhere to all safety instructions within the station premises.

 

Leave a Reply