• About Us
  • Our Team
  • Advertising
  • Careers
  • Contact
Thursday, May 15, 2025
  • Login
No Result
View All Result
Navjeevan Express
Advertisement
  • Gujarat
    • Ahmedabad
    • Vadodara
    • Surat
    • Rajkot
    • Saurashtra
    • Kutch
    • Central Gujarat
    • South Gujarat
  • National
    • Andhra Pradesh
    • Rajasthan
    • Maharashtra
    • Pondicherry
    • Tamil Nadu
    • OTHER STATES
  • Politics
  • Business
    • Companies
    • Personal Finance
  • Sports
    • Cricket
    • Hockey
    • Football
    • Badminton
    • Other Sports
  • Entertainment
    • Arts and Culture
    • Theatre
    • Cinema
    • Photos
    • Videos
  • Lifestyle
    • Fashion
    • Health & Environment
    • Food and Beverages
    • Spirituality
    • Tourism and Travel
  • World
  • More
    • Science and Technology
    • Legal
    • Opinion
    • Student’s Corner
    • Youth
Navjeevan Express
  • Gujarat
    • Ahmedabad
    • Vadodara
    • Surat
    • Rajkot
    • Saurashtra
    • Kutch
    • Central Gujarat
    • South Gujarat
  • National
    • Andhra Pradesh
    • Rajasthan
    • Maharashtra
    • Pondicherry
    • Tamil Nadu
    • OTHER STATES
  • Politics
  • Business
    • Companies
    • Personal Finance
  • Sports
    • Cricket
    • Hockey
    • Football
    • Badminton
    • Other Sports
  • Entertainment
    • Arts and Culture
    • Theatre
    • Cinema
    • Photos
    • Videos
  • Lifestyle
    • Fashion
    • Health & Environment
    • Food and Beverages
    • Spirituality
    • Tourism and Travel
  • World
  • More
    • Science and Technology
    • Legal
    • Opinion
    • Student’s Corner
    • Youth
No Result
View All Result
Navjeevan Express
No Result
View All Result
ADVERTISEMENT
Home Business

Railways uses lockdown period to complete pending maintenance work

The health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 km of the track at 5,362 peak locations indicated by OMS test has been attended to ensure proper quality.

by Navjeevan Express
5 years ago
in Business, Lockdown, railways
Reading Time: 2 mins read
0
0
Railways uses lockdown period to complete pending maintenance work
ADVERTISEMENT

NE NEWS SERVICE

NEW DELHI, MAY 2

If you thought that the world’s largest national transport staffers were taking rest and drawing  salary during the COVID-19 lockdown, change your perception now. The Indian Railways has used the lockdown period and the resultant suspension of passenger services to address long-pending maintenance work and safety management on the rail network, the national transporter said in a statement on Saturday.

This, it said, would improve safety and operational efficiencies.

Around 500 modern heavy-duty Track Maintenance Machines along with the track, signal, and Overhead Equipment (OHE) maintainers have worked regularly for 10,749 machine days to complete overdue track maintenance of 12,270 km plain track, it said.

Ultrasonic flaw detection (USFD) of 30,182 km of track and 1,34,443 rail welds has been carried out with the USFD machine.

“Indian Railways planned these works during lockdown period considering it ‘Once in a lifetime opportunity’ to wipe out these maintenance arrears and take up the execution of work without affecting the train service,” it said.

The health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 km of the track at 5,362 peak locations indicated by OMS test has been attended to ensure proper quality.

Critical summer precaution activities like de-stressing of long welded rail (LWR) which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social-distancing norms. A total of 2,246 km of de-stressing of LWR has been done.

Track work conducted during the lockdown includes remodelling of Kazipet Yard, Vijayawada Yard, Bangalore City yard, Baroda station.

Important bridge works include re-girdering of Bridge No. 86 on Tunga River near Shivamogga Town, dismantling of Road Over Bridge (ROB) near Chennai Station, construction of bridge in Rajahmundry-Vishakhapatnam section, launching of 6 Foot Over Bridges (FOBs) under Bhusawal division among others, according to the statement.

 

Tags: 362 peak locations488 km of the track at 592Bangalore City yardBaroda station.construction of bridge in Rajahmundry-Vishakhapatnam sectionde-stressing of long welded rail (LWR)dismantling of Road Over Bridge (ROB) near Chennai Stationlaunching of 6 Foot Over Bridges (FOBs) under Bhusawal divisionperiodic runs of Oscillation Monitoring System (OMS) cumulating 1remodelling of Kazipet YardThe Indian RailwaysVijayawada Yard
ADVERTISEMENT
Previous Post

IIT-M Faculty Prof. T. Pradeep chosen for prestigious Nikkei Asia Prizes 2020

Next Post

Road to nowhere: Technical issues leave migrants stuck midway between Gujarat and UP

Navjeevan Express

Navjeevan Express

Next Post
Road to nowhere: Technical issues leave migrants stuck midway between Gujarat and UP

Road to nowhere: Technical issues leave migrants stuck midway between Gujarat and UP

Dial 079-23251900, get passes: 3 spl trains with migrants to leave for UP and Odisha from Ahmedabad, Surat stations

ADVERTISEMENT

Recommended

Ministry of Skill Development, 9 IIMs invite applications for Mahatma Gandhi National Fellowship 2021-23

Ministry of Skill Development, 9 IIMs invite applications for Mahatma Gandhi National Fellowship 2021-23

4 years ago
NE Food & Hospitality Editor Dr Kaviraj Khialani conferred with Human Rights Nobel Award

NE Food & Hospitality Editor Dr Kaviraj Khialani conferred with Human Rights Nobel Award

3 years ago
ADVERTISEMENT

Recent Posts

  • Swarrnim University students gain hands-on forensic medicine experience at BJ Medical College
  • From Farm to Fork: ITC Narmada launches Mango Fiesta honouring seasonal bounty with responsible luxury
  • UNCCD Youth Caucus appoints Save Soil Advocate to lead agricultural sustainability efforts

Category

Select Category

    Contact Us

    Email:
    ne.gowri1964@gmail.com

    Phone:
    9643255068

    Live Visitors

    • About Us
    • Our Team
    • Advertising
    • Careers
    • Contact

    © 2021 all right reserved by Navjeevanexpress.com. Consulted by MediaHives.com

    No Result
    View All Result
    • Gujarat
      • Ahmedabad
      • Vadodara
      • Surat
      • Rajkot
      • Saurashtra
      • Kutch
      • Central Gujarat
      • South Gujarat
    • National
      • Andhra Pradesh
      • Rajasthan
      • Maharashtra
      • Pondicherry
      • Tamil Nadu
      • OTHER STATES
    • Politics
    • Business
      • Companies
      • Personal Finance
    • Sports
      • Cricket
      • Hockey
      • Football
      • Badminton
      • Other Sports
    • Entertainment
      • Arts and Culture
      • Theatre
      • Cinema
      • Photos
      • Videos
    • Lifestyle
      • Fashion
      • Health & Environment
      • Food and Beverages
      • Spirituality
      • Tourism and Travel
    • World
    • More
      • Science and Technology
      • Legal
      • Opinion
      • Student’s Corner
      • Youth

    © 2021 all right reserved by Navjeevanexpress.com. Consulted by MediaHives.com

    Welcome Back!

    Login to your account below

    Forgotten Password?

    Retrieve your password

    Please enter your username or email address to reset your password.

    Log In